COMPLETED PROJECTS OVERVIEW
Design and Construction of the drinking water supply and sewerage system of Masalli city of Azerbaijan. The materials used mainly included the local production, as well as the imported from Turkey. HDPE pipes of diameters starting from 110 mm to 630 mm were used during the construction of water supply transmission and distribution pipelines. For the sewerage system corrugated triplex HDPE pipelines were used and the dimensions ranged between 150 mm and 600 mm. The construction also included overground fire hydrants, valves, house connections, installation of water meters and water meter boxes, sewerage manholes, water reservoirs, waste water pumping stations, reinforced concrete wall along the river for protection of the deep wells used for supply of drinking water to the city and other relevant structures. Total constructed length of the water supply network is approximately 209 km and sewerage network is approximately 208 km Construction works also included the supply and installation of Water Treatment Plant (223.000 PE and 1677 m³/h (40,248 m³/day)) and Waste Water Treatment Plant (PE 37000 and 7.462 m³/day daily dry weather flow and 871 m³/h peak wet weather flow). SCADA system operated control station of WTP and WWTP has been installed and provided to Contractor for start up.
Country of contract implementation: Azerbaijan
Contract start date: March 1st, 2013
Contract completion date: December 31st, 2016
In the role of: Subcontractor
Design and Construction of the drinking water supply and sewerage system of Ismayilli city of Azerbaijan. The materials used mainly included the local production, as well as the imported from Turkey. HDPE pipes of diameters starting from 110 mm to 800 mm were used during the construction of water supply transmission and distribution pipelines. For the sewerage system corrugated triplex HDPE pipelines were used and the dimensions ranged between 150 mm and 600 mm. The construction also included overground fire hydrants, valves, house connections, installation of water meters and water meter boxes, sewerage manholes, water reservoirs, water pumping stations, reinforced concrete wall along the river for protection of the deep wells used for supply of drinking water to the city and other relevant structures. Total constructed length of the water supply network is approximately 208 km and sewerage network is approximately 155 km. SCADA system operated control station has been installed for the water transmission line and distribution system.
Country of contract implementation: Azerbaijan
Contract start date: January 1st, 2014
Contract completion date: December 31st, 2016
In the role of : Subcontractor
Design and Construction of the drinking water transmission line from Masalli Vilashchay Water Treatment Plant to Jalilabad city center of Azerbaijan. The materials used mainly included the local production, as well as the imported from Turkey. GRP pipes of 700 mm diameter was used for construction of the transmission line in the length of 28 km and 4 km of HDPE pipes of 500 mm and 630 mm diameter. The construction also included pumping station and balancing reservoir, water reservoir of 500 m3 capacity, SCADA system operated control station, valves and fittings, air and washout valves.
Country of contract implementation: Azerbaijan
Contract start date: March 11st, 2013
Contract completion date: February 28st, 2017
In the role of: Subcontractor
Design and Construction of the drinking water supply and sewerage system of part of Jalilabad city of Azerbaijan. The materials used mainly included the local production, as well as the imported from Turkey. HDPE pipes of diameters starting from 110 mm to 500 mm were used during the construction of water supply transmission and distribution pipelines. For the sewerage system corrugated triplex HDPE pipelines were used and the dimensions ranged between 200 mm and 800 mm. The construction also included overground fire hydrants, valves, house connections, installation of water meters and water meter boxes, sewerage manholes, water reservoirs, wastewater pumping stations. Total constructed length of the water supply network is approximately 55 km and sewerage network is approximately 48 km.
Country of contract implementation: Azerbaijan
Contract start date: March 11st, 2013
Contract completion date: February 28st, 2017
In the role of : Subcontractor
Construction of 5 storeyed residential building consisting of 10 apartments equipped with an elevator, water and sewerage system, electricity, gas, central heating system, telecommunication system. Construction mainly was carried out with a reinfiorced mass concrete and stone blocks.
Country of contract implementation: Turkey
Contract start date: July 21st, 2014
Contract completion date: October 12th, 2015
In the role of : Main Contractor
Construction of 3 storeyed Boarding School that would guest 100 students, including refurbishement under turnkey contract
Country of contract implementation: Turkey
Contract start date: April 4th, 2014
Contract completion date: February 3rd, 2015
In the role of : Main Contractor
Repair of the building of Cankiri Karatekin University Building. The main works consisted of repair of the fasade , roofing and interior painting of the building, including the stairs and the deteriorated doors and windows.
Country of contract implementation: Turkey
Contract start date: August 15th, 2011
Contract completion date: Aprel 30th, 2012
In the role of : Main Contractor
All construction works except for infrastructure, landscaping, furniture and installation of equipment + putting into operation. Contract cost is USD 14.07 mln.
Country of contract implementation: Russia
Contract start date: March 29th, 2012
Contract completion date: October 20th, 2014
In the role of : Subcontractor
Turnkey Delivery of Kindergarden building including design, equipments and landscapingTurnkey Delivery of Kindergarden building including design, equipments and landscaping
Country of contract implementation: Russia
Contract start date: August 15th, 2011
Contract completion date: April 30th, 2012
In the role of : Subcontractor
Mechanical works, installation of equipment, manufacture and installation of pipelines, insulation and painting works, steel structures and installation
Country of contract implementation: Russia
Contract start date: September 1st, 2014
Contract completion date: April 30th, 2015
In the role of : Subcontractor
Detailed design, topographic survey and construction of new water supply systems including earthworks, concrete lining, mass concrete and installation of hydraulic structures under the Reconstruction of Samur-Absheron Irrigation System project. Under the contract, rehabilitation of deteriorated concrete lined canals and hydraulic structures, rehabilitation and construction of underground drainage systems, excavation and backfilling was also carried out.
Country of contract implementation: Azerbaijan
Contract start date: July 04, 2015
Contract completion date: June 30, 2018
In the role of: Subcontractor
Detailed design, topographic survey and construction of new Takhtakorpu-Jeyranbatan Channel under the Reconstruction of Samur-Absheron Irrigation System project feeding Takhtakorpu Water Reservoir. The works included excavation, compaction, backfilling, concrete lining, mass concrete and installation of hydraulic structures. The capacity of the channel is 18 m3/sec.
Country of contract implementation: Azerbaijan
Contract start date: December 22, 2012
Contract completion date: November 17, 2014
In the role of: Subcontractor